DRILLTECH MANUFACTURING CO.,LTD.
English
Русский язык
Home
About Us
Products
News
Services
Honor
Contact us
Product List
The Diverter
Hydraulic actuation ball valve
Ocean drilling BOP
Land drilling BOP
Rotating BOP
The gas layer development BOP
Drilling BOP
Cable BOP
Sucker rod BOP
Coiled tubing BOP
The well test BOP
Annular BOP
Rams BOP
Shaffer/Cameron/Hydril style BOP
Spray box
BOP at low temperature
Shear ram BOP
Variable bore ram BOP
H2S resistant BOP
With pressure cylinder BOP
Manual locking BOP
Hydraulic locking BOP
Double orifice ram BOP
Forging blowout preventer
Casting blowout preventer
BOP for workover
BOP Components
Well control system attachment
Hydraulic locking system
Choke kill manifold
BOP controller
Mobile device of BOP
The well test system
High-pressure hose
Quick connector
Electric control system of drilling rig
Hydraulic Disc brake
Magnetic Eddy Current Brake
Contact Us
DRILLTECH MANUFACTURING CO.,LTD.
Tel:+86-15532811817
Call:+86-317-2010189
E-mail:
dtc11@drilltech.cn dtc01@drilltech.cn
Add:Xinhua industrial zone, Juguan county, Xinhua District, Cangzhou City, Hebei Province, CHINA.
The bop and well control system technical support, testing, maintenance of one-stop solution for free with big customer
news
Home
>>news
Repeat above-mentioned operation, until be full of to fix a well liquid inside the well
2013-12-03
At start construction the spot female It is a more tedious work to press
2013-12-03
Putting to spray a pipeline should is by rule to try to press qualified
2013-12-03
press the technique in the well homework to play to beg and notice of item
2013-12-03
The outstanding advantage that the well bottom often presses a method is
2013-12-03
An important concept of "u" form tube is that set's taking care of is as close and related as pipeline pressure
2013-12-03
press the function of combining the liquid Pressing well process is small
2013-12-03
The bridge blocks up solid mutually the grain give obviation after homework
2013-12-03
economic efficiency(press a well liquid most economically is satisfy basic
2013-12-03
overflow to flow behind of measure to press Equip a perfect circumstance in the mouth of a well under
2013-12-03
Underneath we the simple analysis air is in the problem in the well
2013-12-03
The physical volume that takes care of pillar is decided by the length
2013-12-03
The geologic strata has permeating of necessity sex and allows fluid to flow a person inside the well
2013-12-03
The construction homework is leading cluster, the pass accounts a method to really settle
2013-12-03
In order to hard carry out the environmental protection work group discussion meeting of the farmland enterprise security
2013-12-03
well's controling is implementation to annoy well pressure to the oil of control
2013-12-03
Build up an unifying of complicated circumstance and trouble processing coordination system
2013-12-03
The high pressure oil spirit well means with the geology design provide of geologic strata pressure is basis
2013-12-03
Thoughting a value means that the all levels leadership wants to highly value well to press the work
2013-12-03
Note water well not to stop to note or end decompression
2013-12-03
The control that resumes to the well makes it attain second class well to control appearance
2013-12-03
To sum it up, well's controling is solid Shi You annoys the control of well pressure
2013-12-03
The defending of company production sprays a machine to have artesian well to defend to spray machine
2013-12-03
Defend to spray a machine is used for trying oil and fix to close mouth of a well in the homework processes
2013-12-03
39/Page 3/3
Home
Previous
1
2
3
Next
End
1
2
3
2013-2015 © Copyright: DRILLTECH MANUFACTURING CO.,LTD.
Mobile: +86-15532811817 E-mail:
dtc11@drilltech.cn dtc01@drilltech.cn